In the last week of February, work began to install the irrigation system in the field of "Thomas Roullier Irenaeus. " The idea came from the Executive Committee in order to regain and maintain its concretions from the ground a good long time really is a concern, especially in the winter season. First they made a trench in the area for placement of pipes and 12 outlets where you placed the taps. Then to cover the respective trenches with sand and start watering to tamp the affected areas are now awaiting the installation of a power cable for the pump that was removed to a middle zone, leads to power both the pump and the Tank water can be evenly throughout the field and the risk is equivalent in the different areas. Once the company responsible for lowering the pump cable to complete its work will commence in the irrigation areas (currently done with a single tap), making it much faster and dynamic process.


Many supporters are now interested in the field of play and it is presumed Once down the cord for the pump will have to wait until the grass grows in areas that were settled in order to present the pitch in perfect condition. It is not a certainty, but certainly will be local Campito in their field of play between the first and second week of May.


The wall



Last week finalized the arrangement of lateral boundary wall into the siding, which was in poor condition for several years. Within days the structure was demolished (about 15 meters), built a new base and quickly was reversed left in condition.

0 comments:

Post a Comment